Customer Portal

Wax deposition mitigation strategies optimized by simulation

Wax deposition remains one of the most critical challenges in Flow Assurance. Using ALFAsim’s transient multiphase flow simulation, operators can predict deposition zones, optimize thermal and chemical mitigation strategies, and ensure safe, cost-efficient production.

Wax deposition is one of the most recurrent and costly challenges in Flow Assurance throughout the upstream production chain, particularly in deepwater and unconventional fields. When the temperature of the produced fluid mixture drops below the Wax Appearance Temperature (WAT), also known as the Cloud Point, the heavy hydrocarbon fractions (C20+) precipitate as wax crystals. These crystals accumulate inside pipe walls, restricting flow and leading directly to production losses and high operational costs if not effectively prevented or mitigated.

Managing wax deposition successfully requires a precise, dual approach that integrates physical and chemical methods.

The fundamental mitigation strategies

Effective wax management relies on a combination of controlling the thermal environment and utilizing chemical intervention.

1. Operational and Thermal Management

The primary goal is to keep the fluid temperature above the WAT or use mechanical methods to remove deposits. While insulation, heating, and pigging are common methods ,a crucial part of the operational strategy involves optimizing the production route itself. Simulation studies have shown that the choice between producing through the tubing or the annulus can significantly alter the temperature profile and fluid dynamics. This decision is vital because it determines where and to what wax thickness the deposition will occur, especially under varying environmental conditions, such as Winter and Summer scenarios. Analyzing these sensitivities is essential to finding the most efficient configuration that minimizes deposition and maintains total oil flow rate.

2. Chemical Inhibition

The most common and effective chemical technique is the continuous injection of Wax Inhibitors (WIs). These additives work by interfering with the crystallization process or modifying the crystals so they remain dispersed within the fluid rather than adhering to the pipe wall. However, the success of this method hinges on a critical factor: the inhibitor must be fully homogenized in the flow stream before it reaches the wax deposition zone. Injecting the inhibitor too close to the deposition point can render the chemical ineffective, leading to unnecessary expense and continued flow problems.

The decisive factor: optimization through simulation

Implementing any mitigation strategy without detailed predictive analysis is inherently risky. Over-injection wastes CAPEX and OPEX, while under-injection leads to blockages. This is where advanced numerical simulation is indispensable.

The ALFAsim transient multiphase flow simulator, developed by ESSS, provides the precision required to move beyond guesswork.

The Two-Step Simulation Approach:

  1. 1D Transient Prediction (ALFAsim): The ALFAsim transient multiphase flow simulator, with its dedicated wax deposition models (like the Matzain model, which considers molecular diffusion and shear dispersion), is used to simulate the full well system, including casing, tubing, and trajectory. The 1D transient simulation accurately predicts where the fluid temperature will fall below the WAT and, consequently, where and what maximum wax thickness will form by calculating pressure, temperature, holdup, and flow patterns profiles. It allows for a comprehensive sensitivity analysis of operational parameters, such as tubing length, annulus choke orifice, and production route, to determine the scenario that minimizes wax buildup and maximizes flow rates.
  2. 3D CFD Optimization of Chemical Injection: Once the deposition zone is identified by ALFAsim, a subsequent 3D CFD (Computational Fluid Dynamics) model is created. The flow parameters obtained from the 1D simulation are used as boundary conditions for the 3D model, which is used to assess the homogenization of the injected chemical inhibitor with the production fluid. The key is to find the minimum distance the inhibitor needs to travel to achieve satisfactory mixing.

This two-step process provides crucial data that informs the final design: one study successfully demonstrated that the chemical injection point could be securely placed at 700 meters instead of the originally designed 1500 meters. This reduction in depth, validated by simulation, provides substantial savings in installation costs with low risk.

From Risk Response to Predictive Control

Effective wax mitigation starts with understanding flow behavior—before problems occur. With ALFAsim’s advanced simulation capabilities, operators can anticipate wax formation, optimize chemical injection, and prevent costly downtime. By partnering with ESSS O&G, you gain access to simulation expertise that turns prediction into performance—enhancing safety, reducing OPEX, and driving operational excellence.

Learn how our production and transport solutions empower energy companies to make data-driven decisions, reduce operational risk, and boost profitability.


References

ROSA, Rafael M. D. et al. Assessment of Chemical Injection to Mitigate Wax Deposition in Unconventional Wells. In: SPE ANNUAL TECHNICAL CONFERENCE AND EXHIBITION, 2021, Dubai, EAU. Proceedings… Houston: Society of Petroleum Engineers, 2021. SPE-206206-MS.

ROSA, Rafael M. D. et al. Evaluation of wax deposition in unconventional wells according to tubing and annulus operational strategies. In: SPE BRAZIL FLOW ASSURANCE TECHNOLOGY CONGRESS, 2022, Rio de Janeiro. Proceedings… Rio de Janeiro: Society of Petroleum Engineers, 2022.


Hariel Mendes

Sr. Business Development Specialist, ESSS O&G

Hariel Mendes holds a Bachelor's degree in Petroleum Engineering from the Federal University of Sergipe (UFS) and a Ph.D. in Petroleum Engineering from the State University of Campinas (Unicamp). His experience includes 6 years in the R&D sector and 3 years at ESSS, where he has focused on well integrity monitoring and flow assurance simulations. Since May 2025, Hariel has been working in business development, with a focus on presenting ESSS's technologies to the oil and gas industry and providing engineering support to ESSS's clients.